HW #4 - MODFLOW Grid Approach, Part 2

The objective of this assignment is to add a reservoir to an existing model via the GHB package and iterate the model solution until the flow budget reaches a target amount.

Note: You may NOT work in pairs on this assignment.

Do the following:

1) Download and unzip the following project: resmod.zip

2) Open the project within GMS.

This is a completed MODFLOW model of a site.  However, we need to add a reservoir to the model in the location shown.  This is a small reservoir used for irrigation. 

3) Add the reservoir to the model using the GHB package.  Mark all cells under the reservoir as GHB cells.

4) Enter a stage for the reservoir of 1200 ft.

5) Compute an initial estimate of the reservoir conductance to apply to each cell.  The cells are 400 ft x 400 ft.  Assume that the K of the reservoir sediments is about 0.0001 ft/day and that the sediments are about 10 ft thick.

6) Save and run the model.

7) Use the flow budget tool to view the seepage from the reservoir into the aquifer.  Adjust the conductance until the loss from the reservoir is about 5000 ft^3/day.

Note: As you change the conductance of your GHB cells, do NOT reselect the cells with the Select with Poly command.  Once the GHB cells are created, it is much easier to edit the conductance using the GHB Package Dialog.  You can get to this dialog using the MODFLOW|Source/Sink Packages|General Head Boundary command in the 3D Grid Module.

 

Zip up all files associated with your project.  Log in to your student account to upload your zip archive.